...or with a number of service options.1/ A detailed specification for your projectto ensure compliance with Part F of Building Regulations (2006)2/ Supply and Site Supportto include advice for you or your installer to ensure Best Installation Practice3/ Commissioning and Certificationfor Approved Document F of Building Regulations (2006)4/ A full Turnkey Serviceto include specification, survey, installation, commissioning and certification by experienced, qualified engineers.
to ensure compliance with Part F of Building Regulations (2006)This service is available on a time fee basis or free of charge provided your order is placed in its entirety with Dealec.Once we have established your outline requirements a budget figure for your project will be prepared. Providing this figure is acceptable we will then ask you for a deposit and prepare a detailed specification.This deposit will be offset against your eventual order but is refundable should our final quotation exceed the budget figure by more than 7% and you choose not to proceed with an order.Comprises BR Part F Airflow Calculations & product selection, based on airflow rates & any additional client preferences (brand, control options such as wireless & humidistat, summer cooling bypass, pollen filtration, etc.).What we need to know:Initially you need to tell us the size (and ideally the internal volume) of your property, the number of rooms, the number of wet rooms, the number of occupants etc.Please call or email our sales team for assistance.
to include advice for you or your installer, to ensure Best Installation PracticeComprises specification as above, with an agreed fee for site attendance at 1st fix to ensure Best Installation Practice is followed. A separate 2nd fix site visit can be included if further guidance is required and Commission & Certification can be offered at completion.This service will ensure that you or your contractor are better-placed to install correctly, but you will be ultimately responsible for the integrity of the work.This service is usually available only where Dealec have supplied the ducting and installation drawings.
for Approved Document F of Building Regulations (2006)Comprises Heat Recovery Unit programming, system balancing, digital anemometer readings at each air valve (adjusting as required to meet airflow requirements), completion and provision of the Commission Certificate. This service can only be completed successfully if the installation has been correctly carried out.Any remedial requirements will be flagged, but not implemented.Should additional visits be required for re-inspection, these will normally be at extra cost.
to include specification, survey, installation, Commission and Certification by experienced, qualified engineers.Comprises Specification, Draft Design, Installation Survey, Agreed Design Drawings in AutoCAD and/or PDF, Materials Supply to site, 1st & 2nd Fix with Project Management, Commission, Certification & Handover.Note: Variations to the Agreed Design Drawings may be chargeable, unless minor and easily rectified when installing engineers are on site